Replacing failed, corroded or storm-damaged roofs with minimum disruption to the building below.
Overview
Replacing a roof on a building that is still in use is as much a logistics problem as a construction one. The work has to be sequenced so the building stays weather-tight and operational throughout.
We supply replacement roofing in phased deliveries that match the sequence of work, cut to the lengths measured on site, so each section can be stripped and re-covered without leaving the building exposed.




Phased delivery matched to the work sequence
Sheets cut to measured site dimensions
Existing profiles matched where required
Building stays weather-tight during the work
Standard Colour Range
Charcoal Black
Bold and architectural
Autumn Red
The Sri Lankan classic
Sky Blue
Coastal favourite
Caulfield Green
Blends with landscape
Lazarite Blue
Deep premium tone
Zinc Alume
Natural metallic
Custom colours developed on request. All shades are coated on 55% Al-Zn steel to JIS G 3321 / ASTM A755.
Ready to start your project?
We will help you choose the right profile, thickness and drainage before you commit.